Installation of 10” oil pipeline from Bakr 1 to Al Hamad and from North Amer to South Amer for GPC.
Points for the Scope
- The route Survey using total station and Engineering activities of the two pipelines
- Design the two pipeline profiles
- Design the two pipelines using CAESAR II software and handover a copy of the run out including Stress analysis, Thermal analysis, Expansion joint design …etc.)
Issue pipelines and Tie in’s isometrics
Final Results
Data about the deliverable and how much we add to the client to the client with our effort how fast we was how quality we did etc